|
|
|
DO YOU BUILD TURNOUTS OR CROSSING?
|
|
|
|
| | Part # | Item Description | Weight | Price |  | | RRT-902 | THE OFF-SETTER 1 UNIT Original Carbon Steel Construction | 30 lb. | $666.66 |  | | RRT-900 | THE OFF-SETTER COMPLETE 3 UNITS Original Carbon Steel Construction | 90 lb. | $1,999.00 |
|
|
|
RAILROAD TOOLS AND SOLUTIONS INTRODUCES:
|
|
THE OFF-SETTER
|
|
|
|
|
THE OFF-SETTER IS DESIGNED TO INCREASE SAFETY, QUALITY, AND
PRODUCTIVITY, FOR CREWS BUILDING TURNOUTS OR CROSSOVERS!
|
|
|
|
|
|
|
|
|
|
|
|
|
THE OFF-SETTER IS DESIGNED TO BE PLACED IN NEW CONSTRUCTION UNDER
RAILS IN OFFSET LOCATIONS. THE OFF-SETTER IS PICTURED ON THE HEAD OF RAIL, AND WORKS EFFECTIVELY AS
SUCH BUT, UNDER RAIL INSTALLATION PREVENTS ANY OSTACLES FOR TRACK BOUND EQUIPMENT.
|
|
|
|
|
Click here to select a
model
|
|
|
|
|
GENERALLY TO MAXIMIZE THE OFF-SETTERS,
YOU WILL USE 3 OF THE OFF-SETTER TOOLS PLACED AT EQUAL OFFSET POSITIONS BASED
ON LOCATIONS DERIVED FROM MEASUREMENTS FROM HEEL OF SWITCH OR POINT OR AS
DEPICTED ON DRAWINGS. THE OFF-SETTERS ONCE
POSITIONED CAN THEN BE QUICKLY RACHETED PUSHING OR PULLING RAIL TO OFF-SET
MEASUREMENTS. THE RAIL IS THEN HELD AT
THIS POSITION UNTIL FASTENERS ARE APPLIED.
|
|
|
|
|
|
|
|
|
THE OFF-SETTER IMPROVES SAFETY! NO MORE USE OF JACKS, BLOCKING, OR LINING BARS
TO TRY AND POSITION RAIL TO OFF-SETS I
|
|
|
|
THE USE OF OFF-SETTERS IMPROVES QUAILITY! OFF-SETS
ARE HELD AT EXACT OFF-SET LOCATIONS!
|
|
|
|
THE OFF-SETTER IMPROVES PRODUCTIVITY! ONE MAN CAN
QUICKLY POSITION THE OFF-SETTER AND MAKE ADJUSTMENTS. THIS ALLOW FOR COMPLETE
FASTENING OF ENTIRE CURVE RAIL QUICKER THAN JACKING AND FASTENING OVER AND OVER
WITH ENTIRE CREW.
|
|
|
|